Kitchen Remodel Cost Longmont CO 2026
Every Price Variable Explained — No Surprises
Real Longmont pricing for every kitchen remodel scope. Cosmetic refresh to full gut — all price ranges explained by a 31-year local contractor.
$8,000–$80,000 depending on scope • Free written estimates • One contractor, every trade
Kitchen Remodel Cost by Scope — Longmont CO
Cosmetic Refresh
Paint, hardware, fixtures, lighting updates. No structural changes. Cabinets stay.
$8,000–$18,000
1–2 weeks
Mid-Range Remodel
New stock/semi-custom cabinets, quartz countertops, new appliances, backsplash, updated plumbing and electrical.
$20,000–$45,000
3–6 weeks
Full Gut Remodel
Complete demo, new layout, custom or semi-custom cabinets, premium countertops, all new plumbing, electrical, flooring, drywall, and paint.
$40,000–$65,000
6–10 weeks
Full Gut + Structural (Wall Removal)
Everything above plus load-bearing wall removal, LVL beam, open-concept layout, skylight integration.
$55,000–$80,000
8–14 weeks
What Drives Kitchen Remodel Costs in Longmont
Cabinets
Stock cabinets: $3,000–$8,000. Semi-custom: $8,000–$20,000. Custom: $15,000–$40,000. Cabinets are typically 30-40% of total kitchen remodel cost.
Countertops
Laminate: $800–$2,000. Quartz: $3,000–$8,000. Granite: $2,500–$7,000. Quartzite: $4,000–$10,000. Butcher block: $1,500–$4,000.
Appliances
Builder grade: $3,000–$6,000. Mid-range: $6,000–$12,000. Premium (Sub-Zero, Wolf): $15,000–$30,000. Appliance installation included in our estimate.
City of Longmont Permits
Structural permit: $400–$900. Electrical permit: $200–$500. Plumbing permit: $200–$400. All permits included in our written estimate — no surprise fees.
Longmont Kitchen Remodel Questions
How much does a kitchen remodel cost in Longmont CO in 2026?
Kitchen remodeling in Longmont ranges from $8,000 for a cosmetic refresh to $80,000 for a full gut with structural changes. A mid-range remodel with new cabinets, quartz countertops, and appliances runs $20,000–$45,000. According to NAHB data, kitchen remodels return 60–80% of cost at resale in Colorado’s market.
How long does a kitchen remodel take in Longmont?
A cosmetic refresh takes 1–2 weeks. A mid-range cabinet and countertop remodel takes 3–6 weeks. A full gut takes 6–10 weeks. The biggest timeline variable is cabinet lead time: stock cabinets ship in 1 week, semi-custom in 3–5 weeks, custom in 8–12 weeks. Josh Brooks Construction provides a written project schedule before starting.
What does a full kitchen remodel include?
A full remodel includes demo, new cabinets and hardware, countertops, backsplash, appliances, sink and plumbing fixtures, recessed and pendant lighting, flooring, drywall, paint, and trim. Josh Brooks Construction manages every trade: carpentry, plumbing, electrical, tile, and painting — all under one contract with one fixed price.
Does adding an open concept kitchen require a permit in Longmont?
Yes. Removing a load-bearing wall in Longmont requires a structural permit and engineering. The City of Longmont Building Inspection Division requires permits for all structural modifications. Josh Brooks Construction handles all permitting — we never do permitted work without permits. Unpermitted structural work voids homeowner’s insurance and must be disclosed at sale.
Free Kitchen Remodel Estimate in Longmont
Written estimate. Full line-item pricing. No surprises. Serving Longmont and all of Northern Colorado.
📞 720-828-7997💬 Text UsOnline Quote
CON-24-0152 • $1M/$2M Insured • Senior & Veteran Discounts
